We never run our generator each week. However, we do a weekly inspection and visual check each day. We also do a full load test once a month. Is it common practice to run it each week? If so, would running it without load for a minute or two be ok?
NFPA 110 doesn’t require a run each week (see attached below), but most owners do this anyway as a precaution. Current practice is to run the generators unloaded for no longer than it takes for water temperature to stabilize and then shut them down. Probably shouldn’t take over 5 minutes if thermostats are operating correctly.
Dan Chisholm Sr.
MGi Consulting, Inc.
This e-mail address is being protected from spambots. You need JavaScript enabled to view it