Monthly Testing

Q. Dan should I use the .8 pf for my 30% monthly load test calculations?

A. The monthly load test requirements in NFPA 110 are:

8.4.2* Diesel generator sets in service shall be exercised at least once monthly, for a minimum of 30 minutes, using one of the following methods:

  1. Loading that maintains the minimum exhaust gas temperatures as recommended by the manufacturer.

  2. Under operating temperature conditions and at not less than 30 percent of the EPS nameplate kW rating.

  3. If the engine cannot be loaded as required in (2), the engine shall be operated until the water temperature and the oil pressure have stabilized and then the test shall be terminated before the 30 minute time period expires.

The kW nameplate on most machines assumes an .8pf.

Dan

Sponsors

Blue Pillar
Bodine
Caterpillar
Leviton
Liebert
MK Plastics
Siemens
WESCO

 

Published By:

Diesel Exhaust Systems

 
 

Copyright © 2004-2005 Healthcare Engineering Network
Terms and Conditions

Questions, Comments or Support